Our projects in a few words

  • JGP's experience builds on our history of providing comprehensive services across diverse projects, clients, and industries.
  • We handle works large and small from studies and planning through to construction implementation and commissioning works.
  • Our people drive projects forward for our clients, be it new installations or upgrades and expansions, major shutdowns and plant turnarounds, or strategic guidance on project management systems or future fuels.
  • Clients trust us at scale. We deliver large campaign programmes and major capital works, and adapt to clients needs by taking ownership of dynamic portfolios of small to medium size projects.
  • On-site or off-site, the JGP team operates as, where, and when needed to meet client requirements or constraints for resourcing, geographic location, health and safety, and regulatory compliance.
  • As described on our Markets page, our experience covers industries from city water and port infrastructure to the ongoing progression and evolution of energy supply, generation, storage, transmission, distribution, and utilisation.
  • The Projects List page summarises work we have completed and continue to manage, and a sample of our project highlights are shown below, along with a few of the major plant turnarounds we have managed for our clients.

Clients

Port Taranaki
First Gas
Todd Energy
New Plymouth District Council
Ballance
KPA Unicon
Todd Generation
Methanex New Zealand
Babcock International
"JGP are an invaluable resource for Project Management Services to Firstgas. The Project Managers and Technical support is a very high quality which we cannot obtain elsewhere. I particularly appreciate the focus of Project Management expertise that comes from a company that specialises in this area, which provides Firstgas with better results than we have achieved by using resources from other consultancies with less specialised focus. Thanks for your hard work team!" - Firstgas Engineering and Projects Manager

Project Highlights

  • New Energy

    With Taranaki playing a crucial role in the move towards clean energy, JGP are providing strategic guidance to clients through ongoing research of international studies and projects. Applying this, we have been involved in assessing and trialling national pipelines to help determine their role for energy transmission and distribution in an emerging hydrogen, biogas, and renewable energy economy.
  • New Station Build

    Project management at Firstgas Ltd through design and build for the construction of a new delivery point to supply gas to the Junction Road Power Plant:
    • DN300 hot-tapped connection to the 400-line.
    • Inlet shutdown valve (actuated, fire safe) with full flow bypass.
    • Filter/Separator for removal of TEG/liquid with full flow bypass.
    • Above-ground condensate sump.
    • Series/prove metering system.
    • Single-stream C6 Gas Chromatograph (GC).
    Completed and commissioned ahead of schedule and within budget in October 2019.
  • Station Rebuild

    Firstgas Ltd identified the requirement to upgrade the earthing and bonding of their stations in order to comply with current standards and regulations. Over 60 sites across the North Island have been compiled into a two year campaign. JGP completed commissioning at the majority of sites, while supplying project management across the full campaign.
  • Junction Road Power Plant

    In a project team consisting of Todd Generation, Aurecon, and JGP a world class GE Gas Fired Power Plant was delivered during 2020.Delivering 100 MW on demand to the New Zealand grid, the plant meets all compliance, grid specifications, and local government requirements.Equipment consisting of two GE LM6000 Sprint gas turbines, Suez twin train RO plants, operation buildings, roads, and a high voltage switchyard.
  • New Degasser Install

    Developments at the Mangahewa G site would significantly increase volumes of produced water beyond the capability of the current degasser.The project team was responsible for FEED, detailed design, fabrication, installation, and commissioning of an additional degasser, in advance of the proposed site developments.This was delivered in October 2019 on budget and two months prior to the completion of the site developments.The second degasser was able to de-bottleneck the system and provide increased 3-phase separation capacity.
  • Motunui Campaign Maintenance

    As part of an extensive campaign of maintenance of its Taranaki offsite assets, Methanex put together a turnkey package to completely refurbish Faull Road Mixing Station and Motunui Delivery Point.The scope involved restoration, preventative and corrective remedial maintenance activities including painting for corrosion control, repair or replacement of end of life equipment to all Methanex owned plant contained within the compounds.JGP successfully delivered both Projects on time and on budget with no LTI’s or MTI’s.
  • Omata 02 Tank Farm Refurbishment

    A project including inspection, refurbishment and repair of a 45m litre tank, secondary containment, inlet and export facilities, a 3km pipeline and tie-in to existing ship loading infrastructure. JGP was responsible for the complete delivery of this Project.

Major Plant Turn Arounds

  • Methanex NZ - MOT 01 Restart Project

    As Mechanical Works Supervisor, JGP was responsible for the delivery of all mechanical works associated with the restart of the Mot 1 methanol production plant (part of the overall Motunui methanol production facility). This plant had been idle for 8 years.
    The project involved the complete inspection, overhaul and repairs of pressure vessels and exchangers, piping systems and supports, rotating equipment, lube skids, valves, and trim heater. It also involved the replacement of both Converter and De-Sulfurization Catalysts.
  • Methanex NZ - MOT 01 Turnarounds

    JGP were engaged as client representatives for the MOT 01 turnaround in 2017 and we are currently planning the subsequent 5-yearly turnaround set for 2022. In 2017, JGP had specific responsibility for the delivery of the Reformer work including associated vessels, exchangers, boilers, and piping. All Reformer works were completed successfully on time and within budget with no lost time injuries. Furthermore, JGP also had oversight of two major projects namely replacement of the natural gas Trim Heater and the Air Preheaters.
  • Methanex NZ - MOT 02 Turnarounds

    JGP had overall responsibility for the safe, on time and cost-effective delivery of the Turnaround of the Mot 2 Methanol Production Plant in 2018 while maintaining the highest levels of quality.We are currently planning the subsequent 5-yearly turnaround set for 2023.The 2018 turnaround was the first on the Mot 2 Methanol Production Plant since its restart in 2008.
  • Ballance Agri-Nutrients - Tauranga Turnaround

    JGP provided efficient planning and execution of all routine and non-routine maintenance work, including SIMOPs projects, under construction during the turnaround period of July 2018 to September 2018.A successful initial plant start-up was achieved at the end of execution with all compliance requirements being met. All capital and maintenance projects delivered safely, on schedule, and within approved budgets. Accountable for the health, safety, security, and environmental performance of the site with direct responsibility for all personnel who were executing work in the field.
  • Methanex NZ - WV

    The 2018 Waitara Valley Turnaround (TAR) improved the long-term sustainability of methanol production at the Methanex NZ Waitara Valley (WV) plant.The TAR was required to assure equipment integrity and allow for safe operation until the next statutory inspection. Furthermore it was an opportunity to complete capital projects that required a shutdown to execute.JGP successfully managed several capital projects on time and on budget including SSDS Upgrade, Control Room relocation, cooling tower maintenance and reformer refractory replacement. Further work was also managed and successfully delivered that required the systematic inspection and repair of piping systems utilising a customised tracking process.
  • Ballance Agri-Nutrients - Kapuni Turnaround

    As Turnaround Manager, John had overall responsibility for the Ballance Agri-Nutrients Turnaround at their Kapuni Ammonia/Urea Production Facility. During the Turnaround over 1,700 work orders were competed with 127,000 man-hours worked.
    The Project was successfully completed in April 2016 and the Plant is now achieving record levels of production.
HomeAbout JGPWho we areHSEQNews
ServicesMarkets
Projects:ExperienceProjects list
Contact:Get in touchCareers
Copyright © 2021

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Read about how we use cookies.

Your Cookie Settings

We use cookies to enable essential functionality on our website, and analyze website traffic. Read about how we use cookies.

Cookie Categories

Essential

These cookies are strictly necessary to provide you with services available through our websites. You cannot refuse these cookies without impacting how our websites function. You can block or delete them by changing your browser settings, as described under the heading "Managing cookies" in the Privacy and Cookies Policy.

Analytics

These cookies collect information that is used in aggregate form to help us understand how our websites are being used or how effective our marketing campaigns are.